A small slice of jobs from the last 18 months — retaining walls, site cuts, civil prep and full earthworks scope, all run by the same CT Earthworx crew.

150+
Walls Built
18yr
On the Tools
1
In-House Crew
1 day
Quote Turnaround
Concrete Sleeper Boundary Wall
Featured Project

Concrete Sleeper Boundary Wall

Southside · 2025

A long-run boundary wall replacing rotting timber sleepers. Set on footings, capped with treated galvanised posts and finished with ag-line drainage to keep the new wall dry through wet season.

38m concrete sleepersGalvanised steel postsAg-drain & backfill
Core-filled Besser Block Retaining Wall
Project · 02

Core-filled Besser Block Retaining Wall

Inner Brisbane · 2025

Engineered besser block wall on a tight inner-city block. Cut into the slope, footings poured to spec, steel and core fill placed in lifts and finished with a clean cap row.

  • Engineered 200-series block
  • 1.8m max height
  • Reinforced & core-filled
Footings, Drainage & Site Prep
Project · 03

Footings, Drainage & Site Prep

Hillside Build · 2025

Full site prep for a new build on a sloping hillside lot. Site cut, pier holes augered, strip footings poured and stormwater run to legal point of discharge.

  • Pier holes
  • Strip footings
  • Ag-line stormwater
Sub-floor Excavation & Block Walls
Project · 04

Sub-floor Excavation & Block Walls

Queenslander Raise · 2024

Worked under a raised Queenslander to create a new ground floor. Sub-floor dug out, internal besser block walls built to engineer's design and slab prep handed over to the builder.

  • Excavation under raised house
  • Internal block walls
  • New slab prep
Exposed Aggregate Driveway & Frontage
Project · 05

Exposed Aggregate Driveway & Frontage

Northside · 2025

Old plain driveway and crossover removed, new exposed aggregate pour with matching paths and refreshed stormwater. Council crossover approval handled in-house.

  • Crossover replacement
  • Exposed aggregate finish
  • Stormwater & path
Bulk Excavation & Hardstand
Project · 06

Bulk Excavation & Hardstand

Sloping Block · 2025

Bulk excavation on a steep block to create a level building platform, with compacted hardstand and stormwater pits installed for the new build slab.

  • Bulk dig & cart
  • Compacted hardstand
  • Stormwater pits

Your project next.

Send through plans, sketches or even just a photo of your block — we'll get back within one business day.

Start a Project